BIGWIN joins with customers in sustainable business development
BIGWIN joins with customers in sustainable business development
Previous
Next
PRODUCT
Centrifugal Castings made of: Steel Alloy, Stainless Steel Alloy, Copper Alloy, & Machining
Hot Forging – Blade for Machine
Stainless Steel Investment Casting – Shaft Clamp Assembly
Iron Casting – Inlet Assembly
Iron Casting – Crankcase
Stainless Steel Plunger
Seamless Stainless Steel Cylinder Tube
Small Type Inverter/AC Motor Driver/DC Motor Controller
Inverter/AC Motor Driver/DC Motor Controller
Hose Reel Motor
Previous
Next
Q&A
What information should be included in the inquiry?
Each inquiry requesting a quote should include the following and as specific as possible, so that we may quote accurately to meet your needs.
- Specs, drawings, and or samples of the products you are planning to inquire.
- Kind and grades of materials to be used.
- Finish of surfaces.
- Annual quantities and shipping quantities of each part.
- Price terms required:
FOB or C&I Taiwan
CFR or CIF (Please indicate the destination of your seaport or airport)
Is there a minimum order quantity of each product?
No, we do not have minimum quantity requirements, but please keep in mind that the less the quantity is, the higher the cost will be.
How long does it take to get a quotation?
It depends on the numbers of parts and necessity of molds and tooling if needed. The average quote time is 2 to 10 days.
What are your lead times of products or delivery?
Normally samples in 30-65 days if the tooling and molds are needed, and production in 45-80 days after sample approval.
What are your payment terms?
Tooling: paid by T/T(Telegraphic Transfer, Wire Transfer)– 50% deposit with order, balance on approval of samples.
Volume order Production: by T/T or an L/C (Letter of Credit).
- Mailing Address: P. O. Box 235, Yuanlin, Changhua, TAIWAN 510945